top of page
5.jpg
1/5
Description
JML Engineering was awarded the project to stabilize severe erosion of the slip beside Superior Elevator in Thunder Bay, Ontario. Erosion occurred after unseasonably high water levels on Lake Superior.
The project was initiated with topographic and bathymetric survey of the site.
A Design Brief was prepared outlining the repair options for the site and the armour stone solution was selected.
During construction JML Engineering completed periodic inspections, a site visit to the nearby quarry to inspect the armour stone and full time inspection was done during the installation of the armour stone.
bottom of page